Computing & Engineering Building (CEB)
This is the main building for CS classes. http://www.ewu.edu/x9239.xml

This building is the home of the Computer Science Department and the Engineering and Design Department. It has 3 main floors, and a basement. There are restrooms on each floor, a central staircase connecting all the floors, and an elevator connecting all the floors.
The top floor has the main office, faculty and staff offices, and graduate assistant and graduate instructor offices. There is also a small CS library and a computer lab (not open for general use) on this floor.
The second floor has most of the classrooms and labs used for CS courses.
See more images in the CEB listing in the GALLERY.
Building Facts and Data
- Gross square feet
- 93,242
- Total classrooms
- 15
- Total Laboratories
- 21
- Pre-design, design & construction drawings
- $2,225,000
- Total cost
- $26,225,482
- Grand opening ceremonies date
- October 19, 2005
- Start of construction
- September 2003